{"id":899,"date":"2017-04-11T16:57:23","date_gmt":"2017-04-11T15:57:23","guid":{"rendered":"http:\/\/www.madeinpreston.co.uk\/b\/?p=899"},"modified":"2017-04-11T16:57:24","modified_gmt":"2017-04-11T15:57:24","slug":"railway-electrification-in-the-north-west","status":"publish","type":"post","link":"https:\/\/www.madeinpreston.co.uk\/b\/2017\/04\/railway-electrification-in-the-north-west\/","title":{"rendered":"Railway Electrification in the North West"},"content":{"rendered":"<p>Work is underway at a fairly slow pace on electrifying more track in the North West of England.<\/p>\n<p>Currently the Manchester to Blackpool line is forecast for completion for the summer timetable of 2018. \u00a0Work on re-aligning the track is underway. \u00a0A big task will close Blackpool station from\u00a0November 2017 for several weeks into 2018.<\/p>\n<p>Trans-Pennine routes from Manchester to York and Selby are underway. \u00a0This is a large project involving 76 miles of track and many tunnels and bridges. \u00a02022 is a date mentioned for completion.<\/p>\n<p>A 300metre stretch in the middle of Manchester, called the Ordsall Chord, is underway which will allow trains to go between Victoria and Piccadilly. \u00a0Unfortunately it cuts off the track at the Manchester Science Museum that is the original stretch from the earliest Stephenson days. \u00a0Forecast for completion in late 2017.<\/p>\n<p>There is talk of a High Speed 3 (HS3) link between Manchester and Leeds. \u00a0As well as the HS2 link to Manchester and Leeds from Birmingham, creating a neat triangle. \u00a0Although it isn&#8217;t certain what standard of high speed HS3 will be. \u00a0 Quite likely to be slower than HS2. \u00a0Give that 20 years.<\/p>\n<p>In addition there is work scoping big changes to rail signalling. \u00a0This will remove all trackside signals and put them in the drivers cab along with data exchanges that will enable trains to have moving clear stretches between them rather than them being fixed by stationary signals. \u00a0Give that 30 years.<\/p>\n<p>There is a lot happening on rail.<\/p>\n<div id=\"attachment_900\" style=\"width: 610px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.madeinpreston.co.uk\/b\/2017\/04\/railway-electrification-in-the-north-west\/plfelec\/\" rel=\"attachment wp-att-900\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-900\" class=\"size-full wp-image-900\" src=\"http:\/\/www.madeinpreston.co.uk\/b\/wp-content\/uploads\/PLFElec.jpg\" alt=\"Hard Working on Preston to Blackpool electrification March 2017\" width=\"600\" height=\"450\" srcset=\"https:\/\/www.madeinpreston.co.uk\/b\/wp-content\/uploads\/PLFElec.jpg 600w, https:\/\/www.madeinpreston.co.uk\/b\/wp-content\/uploads\/PLFElec-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><p id=\"caption-attachment-900\" class=\"wp-caption-text\">Hard Working on Preston to Blackpool electrification March 2017<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Work is underway at a fairly slow pace on electrifying more track in the North West of England. Currently the Manchester to Blackpool line is forecast for completion for the summer timetable of 2018. \u00a0Work on re-aligning the track is &hellip; <a href=\"https:\/\/www.madeinpreston.co.uk\/b\/2017\/04\/railway-electrification-in-the-north-west\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,1],"tags":[],"class_list":["post-899","post","type-post","status-publish","format-standard","hentry","category-technological","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/posts\/899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/comments?post=899"}],"version-history":[{"count":2,"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/posts\/899\/revisions"}],"predecessor-version":[{"id":902,"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/posts\/899\/revisions\/902"}],"wp:attachment":[{"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/media?parent=899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/categories?post=899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.madeinpreston.co.uk\/b\/wp-json\/wp\/v2\/tags?post=899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}